Design Steps are not getting synchronized
PreviousRequirement Traceability is not getting synchronizedNextGetting error: "The Web server is configured to not list the contents of this directory" while acces
Last updated
The user has configured an integration between Test Plan entity of Micro Focus ALM/QC and any entity of the target system. The field Design Steps of the Test Plan entity has been mapped to the relevant field entity in the target system; however, they aren't getting synchronized.
A probable reason for this behavior can be a missing value of Database Schema Name and/or Proxy URL in the system configuration form for Micro Focus ALM/QC.
To synchronize the Design Steps with Micro Focus ALM/QC, a user needs to mention Database Schema Name and/or Proxy URL in the system configuration form for specific versions of Micro Focus ALM/QC.
To determine which particular field (Database Schema Name and/or Proxy URL) is required for a particular version of Micro Focus ALM/QC to synchronize Requirement Traceability, please refer System configuration in Micro Focus ALM/QC.
Note: To configure proxy, please refer Proxy Configuration.
Note: To configure System, please refer System Configuration. design-steps-are-not-getting-synchronized
Last updated

